Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18O00019

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18O00019","CONSTRUCTION OF FLOOD CONTROL PROTECTION DIKE ALONG MUZON RIVER, MALABON, NAVOTAS-OBANDO SECTION, MALABON CITY","Flood Control and Drainage","Completed",481654780.52,0,100,"National Capital Region","National Capital Region","FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916) / NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)","2019-01-20","2021-12-16",2018,"Regular Infra - GAA 2018 OO-2",14.59428,120.96655,"1380600000","1303900000"]
SHA-256
1ece741d7a8fd75d78b0ca0dfffdf3cbde19a42a840579c4e2df117d10462cfd

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.