Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18O00029

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18O00029","UPGRADING OF LONGOS PUMPING STATIONS 1 AND 2 (PHASE 2), MALABON CITY","Flood Control and Drainage","Completed",95159516.06,0,100,"Flood Control Management Cluster","Central Office","E. F. CHUA CONSTRUCTION, INC. (37826)","2018-10-31","2019-06-27",2018,"Regular Infra - GAA 2018 OO-2",14.65762,120.95619,"1380400000","1307500000"]
SHA-256
e389f3e94f86e9a777dfe584e27dde625de18814660c38999ea78d6ddd9d238e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.