Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18OB0148

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18OB0148","CONST. OF PALINGON RIVER DRAINAGE OUTFALL, BRGY. PALINGON, TAGUIG CITY","Flood Control and Drainage","Completed",10520264.23,0,100,"Metro Manila 1st DEO","National Capital Region","GREENWALL CONSTRUCTION (14457)","2018-02-19","2018-06-18",2018,"Regular Infra - GAA 2018 OO-2",14.53786,121.07713,"1381500000","1307600000"]
SHA-256
9aca4342c3a9825cb872329dad940b5dfbb558b00704f9500bf119f7d88a49db

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.