Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18OD0004

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18OD0004","IMPROVEMENT OF ROADS AND DRAINAGE ALONG RICKY ST., BRGY. GEN. T. DE LEON, VALENZUELA CITY","Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Rehabilitation - PCCP","Completed",6371947.3,0,100,"Metro Manila 3rd DEO","National Capital Region","TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) (9302)","2018-02-26","2018-10-13",2018,"Regular Infra - Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Rehabilitation - PCCP",14.68326,120.98583,"1381600000","1307500000"]
SHA-256
a168d95a943636e72383554de7deb6f7513e84eef6697a1be4a5b040c9f99452

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.