Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18OD0126

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18OD0126","CONSTRUCTION / REHAB. OF RIVERWALL ALONG TULLAHAN RIVER STA. 8+716 - STA. 8+739 & STA. 10+754 - STA. 10+779, VALENZUELA CITY","Flood Control and Drainage","Completed",9146857.08,0,100,"Metro Manila 3rd DEO","National Capital Region","J. SIMEON CONSTRUCTION (31867)","2018-03-28","2018-07-30",2018,"Regular Infra - GAA 2018 OO-2",14.67612,120.99646,"1381600000","1307500000"]
SHA-256
e4933fe123348cf6fe6d27ffc706c4fce5df013de6e050632138aad53045af44

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.