Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18OE0012

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18OE0012","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:BANK IMPROVEMENT (STEEL SHEET PILES) SETERO DE SAN MIGUEL STA. 0+000 TO STA.","Flood Control and Drainage","Completed",37114955.2,0,100,"North Manila DEO","National Capital Region","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2018-02-12","2018-09-09",2018,"Regular Infra - GAA 2018 OO-2",14.59929,120.99607,"1380600000","1303900000"]
SHA-256
0d707ede14ff9ade8c8a79ad4dc0b7a8d803e91f76aaad3c69ac88947ce387c4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.