Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18OE0050

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18OE0050","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-BANK IMPROVEMENT (STEEL SHEET PILE) ESTERO DE NORTH MAYPAJO STA. 0+325.20 TO","Flood Control and Drainage","Completed",23263394.79,0,100,"North Manila DEO","National Capital Region","DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) (8931)","2018-02-26","2018-07-25",2018,"Regular Infra - GAA 2018 OO-2",14.6362,120.96879,"1380100000","1307500000"]
SHA-256
bc4a4c1415205d1e5c91966b2fbc3df86bfa9e9ca0eefb059cd4e4604b6a2430

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.