Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18OI0150

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18OI0150","WIDENING/RETROFITTING/STRENGTHENING OF MARCOS ALVAREZ BRIDGE 1 ALONG MARCOS ALVAREZ ROAD, LAS PIÑAS","Bridges","Completed",24082759.68,0,100,"Las Piñas-Muntinlupa DEO","National Capital Region","G.F. FABIAN CONSTRUCTION (38962)","2018-10-14","2019-11-09",2018,"Regular Infra - GAA 2018 LP",14.43527,121.00594,"1380200000","1307600000"]
SHA-256
cd8779d1b81f93f26ac57915a3a11dbc4685c88e078f91d678de285ba7e003c9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.