FY2026 GAA: ₱6.79T
PisoScan

Project 18PA0111

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18PA0111","CONSTRUCTION OF FLOOD CONTROL STRUCTURE STA. 0+000 - STA. 0+680, BRGY. BANGLOLAO, BUCAY, ABRA","Flood Control and Drainage","Completed",45907266.36,0,100,"Abra DEO","Cordillera Administrative Region","739 BUILDERS (31174)","2018-05-24","2018-11-07",2018,"Regular Infra - GAA 2018 OO-2",17.53401,120.71883,"1400103000","1400100000"]
SHA-256
1112ddb1833ac3dfb4695663a4b1f602a31c46da4def146a2824abba1e272a83