Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18PD0049

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18PD0049","FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION/REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG ASIN-GALLANO RIVER, BAGUIO CITY","Flood Control and Drainage","Completed",37164000.18,0,100,"Baguio City DEO","Cordillera Administrative Region","GOLDRICH CONSTRUCTION & TRADING (16489)","2018-02-18","2018-12-09",2018,"Regular Infra - GAA 2018 OO-2",16.42843,120.55126,"1401113000","1401100000"]
SHA-256
b12b52ffdf83536b9b0ebfdb087e819993ad38b3c6fd4489901fd199aa2f7fa8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.