Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18PD0121

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18PD0121","CONT. PACKAGE 19: DRERF-FLOOD CONTROL AND DRAINAGE-REST. OF VAR. PROJS DAMAGED BY TY OMPONG A) OUTLOOK DRIVE K0254+480-K0254+490 B)STO. TOMAS MT. CABUYO RD K0252+536-K0252+542 L/S C) BALATOC ROAD K0248+814-K0248+830 D) SOUTH DRIVE K0252+470-K0248+830 E) L","Roads","Completed",1416415,0,100,"Baguio City DEO","Cordillera Administrative Region","GONZALO CONSTRUCTION (1826)","2019-01-03","2019-04-10",2018,"Regular Infra - GAA 2018 LP",16.41051,120.62121,"1430300000","1401100000"]
SHA-256
2a06c80da03cf55ff53a5f00010f2162a353baad959442d19e95f34aab362068

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.