Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18PF0064

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18PF0064","CONSTRUCTION OF TWO-STOREY, SIX-CLASSROOM SCHOOL BUILDING AT LAM-AYAN ELEMENTARY SCHOOL","Buildings and Facilities","Completed",11682860.56,0,100,"Benguet 2nd DEO","Cordillera Administrative Region","FJ MIRANDA CONSTRUCTION (41349)","2018-06-25","2019-01-25",2018,"Outside Infra - GAA 2018 DepEd BEFF",16.80952,120.87889,"1401105000","1401100000"]
SHA-256
f53e2b653a89f73421a7b77a8a0991a4bb72491bafa4157df8314ac4b8830a85

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.