Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18PI0053

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18PI0053","NDRRMF-REHABILITATION/RECONSTRUCTION/REPAIR OF CHICO RIVER FLOOD CONTROL, PANGPANG SECTION, STA. 0+000 - STA. 0+200 (I.S.), SAMOKI, BONTOC, MT. PROVINCE","Flood Control and Drainage","Completed",7113998.7,0,100,"Mountain Province 1st DEO","Cordillera Administrative Region","KOMICHOV GENERAL CONSTRUCTION (42292)","2018-12-24","2019-03-28",2018,"Regular Infra - GAA 2018 LP",17.08935,120.9788,"1404404000","1404400000"]
SHA-256
dea7c9d2d494509090ed1a53ace6915e57865c9cb2cb0505138150a18a9774d3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.