Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18PI0076

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18PI0076","NATIONAL DISASTER RISK REDUCTION AND MANAGEMENT FUND (NDRRMF) (CALAMITY FUND) - FLOOD CONTROL: REHABILITATION/RESTORATION OF CHEPPAY-EYEB FLOOD CONTROL, STA. 1+800-STA.2+040 (I.S) BONTOC ILI & POBLACION, BONTOC, MT. PROVINCE DAMAGED BY HABAGAT","Flood Control and Drainage","Completed",1921475.75,0,100,"Mountain Province 1st DEO","Cordillera Administrative Region","LEWIN VANNE GENERAL ENGINEERING AND CONSTRUCTION (42942)","2019-01-11","2019-03-28",2018,"Regular Infra - GAA 2018 LP",17.0919,120.97884,"1404404000","1404400000"]
SHA-256
e43c96303a5831e6c2b4ffbc8f68ce4208323146890273a778824fcb1be21a59

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.