Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19AC0038

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19AC0038","CONSTRUCTION OF CABUGAO RIVER FLOOD CONTROL, BRGY. NAMRUANGAN - TUROD, CABUGAO, ILOCOS SUR","Flood Control and Drainage","Completed",4654759.45,0,100,"Ilocos Sur 1st DEO","Region I","NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY (37062)","2019-07-08","2019-09-06",2019,"Regular Infra - GAA 2019 OO-2",17.80464,120.43491,"102905000","102900000"]
SHA-256
94df2b7e502ef76e150686601abd8e6e18d886e960816485fc84dca0ca4121da

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.