Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19AD0057

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19AD0057","CONSTRUCTION/REHAB OF FLOOD MITIGATION FACILITIES WITH MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUTION OF CABUGAO RIVER CONTROL, SUYO, ILOCOS SUR","Flood Control and Drainage","Completed",14095358.53,0,100,"Ilocos Sur 2nd DEO","Region I","VILLAR GENERAL CONSTRUCTION AND SUPPLIES (22540)","2019-07-08","2019-11-25",2019,"Regular Infra - GAA 2019 OO-2",16.961,120.496,"102932000","102900000"]
SHA-256
4a2da60bbba2bc2219da418f35bff8d37d875e981b19971d4eee989dee644fe9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.