Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19AD0058

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19AD0058","CONSTRUCTION/MIANTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:  RECHANNELING OF SAN-NICOLAS PAYPAYAD FLOOD CONTROL, CANDON CITY, ILOCOS SUR","Flood Control and Drainage","Completed",42114869.68,0,100,"Ilocos Sur 2nd DEO","Region I","FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP. (11645)","2019-07-12","2020-11-24",2019,"Regular Infra - GAA 2019 OO-2",17.18635,120.44071,"102906000","102900000"]
SHA-256
659975ff0c76912dba90072e676bc3da9c02f0a4f7093bc77552bf1531fcb11d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.