Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19AD0064

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19AD0064","CONSTRUCTION/MIANTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:  CONSTRUCTION OF SALVADOR-BUCONG-DARAPIDAP FLOOD CONTROL (UPSTREAM SECTION), CANDON CITY, ILOCOS SUR","Flood Control and Drainage","Completed",44140375.98,0,100,"Ilocos Sur 2nd DEO","Region I","FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP. (11645)","2019-05-30","2020-11-30",2019,"Regular Infra - GAA 2019 OO-2",17.2227,120.47628,"102906000","102900000"]
SHA-256
941e8d18ca08483b4bb45c56f210fbf18a3f2a6e619541aff2249e0a9068d9ae

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.