Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19AD0086

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19AD0086","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF ABRA RIVER CONTROL, SACUYYA NORTE, SECTION, SANTA, ILOCOS SUR","Flood Control and Drainage","Completed",28210370.08,0,100,"Ilocos Sur 2nd DEO","Region I","M.V. SABALBURO CONSTRUCTION AND SUPPLY (32561)","2019-05-31","2019-10-16",2019,"Regular Infra - GAA 2019 OO-2",17.53591,120.44156,"102922000","102900000"]
SHA-256
57db717a9c006ac28e763268a3a9656e5b8d95f9f49e3c093a7ec8a8108cb9c2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.