Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19AD0090

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19AD0090","CONSTRUCTION/REHAB OF FLOOD MITIGATION FACILITIES WITH MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD CONTROL ALONG SILAG-STA. MARIA RIVER, STA. MARIA, ILOCOS SUR","Flood Control and Drainage","Completed",38591669.49,0,100,"Region I","Region I","MBB CONSTRUCTION AND SUPPLY (FORMERLY: MBB CONSTRUCTION) (11363)","2019-07-22","2020-03-17",2019,"Regular Infra - GAA 2019 OO-2",17.36001,120.49588,"102926000","102900000"]
SHA-256
9331b1c161defc7649a4ef836328b915d734ddee049c9b5678b3d53d7b370d8c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.