Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19AD0113

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19AD0113","CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS, ANTENG PS, NARVACAN, ILOCOS SUR","Buildings and Facilities","Completed",4919144.21,0,100,"Ilocos Sur 2nd DEO","Region I","M.A. TEJADA CONSTRUCTION (32128)","2019-09-27","2020-11-09",2019,"Outside Infra - GAA 2019 DepEd BEFF",17.48112,120.49846,"102914000","102900000"]
SHA-256
8dd6e6ef73daa4c8512aa31a1616c453d9c85f3cafd026164981cbfb2b294d99

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.