Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19BC0056

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19BC0056","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF NEGRO-CABAYU FLOOD CONTROL PROJECT, BALLESTEROS, CAGAYAN","Flood Control and Drainage","Completed",19047280,0,100,"Cagayan 2nd DEO","Region II","EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2019-05-24","2020-02-11",2019,"Regular Infra - GAA 2019 OO-2",18.27599,121.47562,"201507000","201500000"]
SHA-256
25ddce91b5f96cfb1983694f3ae2d961cc370fcc2ea4d4ea27513d8acbe67bc7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.