Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19BC0058

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19BC0058","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF ZINUNDUNGAN RIVER CONTROL, MALINTA, LASAM, CAGAYAN","Flood Control and Drainage","Completed",24500000,0,100,"Cagayan 2nd DEO","Region II","JLL PULSAR CONSTRUCTION CORPORATION (FORMERLY: PULSAR CONSTRUCTION) (24422)","2019-05-27","2020-02-26",2019,"Regular Infra - GAA 2019 OO-2",17.54607,121.67909,"201512000","201500000"]
SHA-256
fde3e2b062e0df5d0c4d8e66a5b559ea198bdf6204f1eed276b61856bdf9a0fb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.