Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19BC0130

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19BC0130","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF ABULUG RIVER CONTROL","Flood Control and Drainage","Completed",62725000,0,100,"Cagayan 2nd DEO","Region II","EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2019-08-29","2020-08-28",2019,"Regular Infra - GAA 2019 OO-2",18.34755,121.43363,"201501000","201500000"]
SHA-256
eac2e43343ead7138daf88e891aa548f777aadbd4142fe0fa25488a0d9c23f26

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.