Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19BJ0001

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19BJ0001","FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONSTRUCTION OF STA. FE RIVER FLOOD CONTROL STRUCTURES, MANGAYANG SECTION, MANGAYANG, DUPAX DEL SUR, NUEVA VIZCAYA","Flood Control and Drainage","Completed",26620132.97,0,100,"Nueva Vizcaya 2nd DEO","Region II","BRG CONSTRUCTION (21931)","2019-06-21","2019-11-09",2019,"Regular Infra - GAA 2019 OO-2",16.31275,121.06471,"205008000","205000000"]
SHA-256
c6229132adc706e4210e8e90c804755c780bb7ea7a4cefdba4766b816062d9bc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.