Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CA0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CA0015","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION/MAJOR REPAIR OF FLOOD CONTROL STRUCTURE-REHABILITATION/IMPROVEMENT OF FLOOD CONTROL PROJECT ALONG MORONG RIVER,  STA. 0+000- STA. 0+350 BARANGAY BINARITAN, MORON","Flood Control and Drainage","Completed",34299997.5,0,100,"Bataan 1st DEO","Region III","HORAMABI BUILDERS (24129)","2019-07-24","2021-02-26",2019,"Regular Infra - GAA 2019 OO-2",14.68201,120.26629,"300808000","300800000"]
SHA-256
15619b9193ea4f36810d919941c078f4b65f1baa79410b601b5ddee2d9b88f93

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.