FY2026 GAA: ₱6.79T
PisoScan

Project 19CA0033

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CA0033","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION/MAJOR REPAIR OF FLOOD CONTROL STRUCTURE-REHABILITATION/IMPROVEMENT  OF FLOOD  CONTROL PROJECT   ALONG PAGALANGGANG RIVER,   STA.  (-) 0+402.60  STA. (-) 0+745.6","Flood Control and Drainage","Completed",34299995.71,0,100,"Bataan 1st DEO","Region III","HORAMABI BUILDERS (24129)","2019-07-22","2020-01-15",2019,"Regular Infra - GAA 2019 OO-2",14.89587,120.46692,"300804000","300800000"]
SHA-256
4acd8d0289af26d7ef2be43285409f8422ce59fc0c610e7267f5bbde605b70b3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.