Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CA0042

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CA0042","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF FLOOD CONTROL PROJECT ALONG COLO RIVER BAMBAN SECTION PHASE B, HERMOSA, BATAAN","Flood Control and Drainage","Completed",24499998.47,0,100,"Bataan 1st DEO","Region III","TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)","2019-06-28","2019-11-22",2019,"Regular Infra - GAA 2019 OO-2",14.84628,120.42604,"300805000","300800000"]
SHA-256
6a2dc4095f55fe7537a13c6864d22c6ac205abdb5f7b6597b2d27668a27c8fd6