Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CA0047

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CA0047","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL PROJECT ALONG CURING CREEK, STA. 0+000  STA. 0+371, BARANGAY MULAWIN, ORANI, BATAAN","Flood Control and Drainage","Completed",37084671.16,0,100,"Bataan 1st DEO","Region III","HORAMABI BUILDERS (24129)","2019-07-24","2021-03-12",2019,"Regular Infra - GAA 2019 OO-2",14.80961,120.52374,"300809000","300800000"]
SHA-256
22deca0c204d0a157fa137e7bc8f6639c70a4dec9ad631e66a8f6ce4a905fcb2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.