Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CA0059

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CA0059","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM  IMPROVEMENT/ REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG PENTOR-BALSIK RIVER (TORRES SECTION), STA. (-) 2+735 TO STA.     (-) 2+931DINALUPIHAN, BATAAN","Flood Control and Drainage","Completed",19599994.14,0,100,"Bataan 1st DEO","Region III","P.C. VALENCIA CONSTRUCTION (32742)","2019-07-11","2019-11-20",2019,"Regular Infra - GAA 2019 OO-2",14.87569,120.47361,"300804000","300800000"]
SHA-256
7aa6c6e6a768fceb21451b58b3555a78239c850a4913180f81d8ecbd64515577

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.