Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CB0049

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CB0049","CONSTRUCTION OF PANGULISAN RIVER CONTROL, IBAYO, BALANGA CITY, BATAAN","Flood Control and Drainage","Completed",9800000,0,100,"Bataan 2nd DEO","Region III","VF CONSTRUCTION (10048)","2019-06-10","2019-10-30",2019,"Regular Infra - GAA 2019 OO-2",14.68776,120.54033,"300803000","300800000"]
SHA-256
a6fd70385c2b30ca91ee5c9120bbfafbf190eaa2d8c92cf1860ce271cd24937e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.