Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CC0113

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CC0113","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ANGAT RIVER TIBAGAN SECTION BUSTOS, BULACAN","Flood Control and Drainage","Completed",23274298.21,0,100,"Bulacan 1st DEO","Region III","M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)","2019-06-25","2019-12-01",2019,"Regular Infra - GAA 2019 OO-2",14.96048,120.94635,"301422000","301400000"]
SHA-256
6557f4f735ebc86570c94dc59ba9b43de8279026e2955b2c3a09c25b761f6f42

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.