Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CC0221

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CC0221","CONSTRUCTION OF MULTI-PURPOSE BUILDING TIBAG HS TIBAG, BALIUAG, BULACAN","Buildings and Facilities","Completed",4701643.56,0,100,"Bulacan 1st DEO","Region III","M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)","2019-07-31","2019-11-27",2019,"Regular Infra - GAA 2019 LP",14.84182,120.85039,"301410000","301400000"]
SHA-256
640b957424d7321fcd1f02c71c7459ff9b9f6f69ee24aca634e5865ed446216a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.