Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CD0097

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CD0097","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MARILAO RIVER AND ITS TRIBUTARIES PHASE II, MARILAO, BULACAN","Flood Control and Drainage","Completed",46549787.41,0,100,"Bulacan 2nd DEO","Region III","M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)","2019-07-11","2020-04-16",2019,"Regular Infra - GAA 2019 OO-2",14.75707,120.9369,"301411000","301400000"]
SHA-256
d27d20060aa9a2438239baacd86d8ffd67add45f4f6557cb4e4aa262962d2cf9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.