Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CD0101

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CD0101","REHABILITATION / MAJOR REPAIR OF FLOOD CONTROL STRUCTURES ALONG MEYCAUAYAN RIVER (SALUYSOY SECTION), MEYCAUAYAN CITY, BULACAN","Flood Control and Drainage","Completed",37435600.37,0,100,"Bulacan 2nd DEO","Region III","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2019-07-11","2020-02-22",2019,"Regular Infra - GAA 2019 OO-2",14.73856,120.95726,"301412000","301400000"]
SHA-256
388b36233564e0f20254eec63265e3625bb55a37fd75dc34477dbe424e9507a9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.