Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CD0219

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CD0219","CONSTRUCTION/IMPROVEMENT OF PUMPING STATION BISITA - SALUYSOY, MEYCAUAYAN RIVER","Flood Control and Drainage","Completed",4898040.52,0,100,"Bulacan 2nd DEO","Region III","M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)","2019-07-11","2019-09-01",2019,"Regular Infra - GAA 2019 OO-2",14.74028,120.95389,"301412000","301400000"]
SHA-256
a19bc6a721477c650cf604201746b56acb5edd8b6ccabdcc50565d4799eb112e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.