Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CD0344

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CD0344","CONSTRUCTION OF 4-STOREY, 12 CLASSROOM SCHOOL BUILDING BAGONG BUHAY F ES SAN JOSE DEL MONTE CITY, BULACAN","Buildings and Facilities","Completed",30866246.14,0,100,"Bulacan 2nd DEO","Region III","M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)","2019-08-29","2020-05-24",2019,"Outside Infra - GAA 2019 DepEd BEFF",14.8494,121.05734,"301420000","301400000"]
SHA-256
73a209f5ec44f7370d096fcd17f4f10a04bd5459ae44316d6efb922e2d86cac2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.