Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CF0077

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CF0077","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION/MAINTENANCE OF PAMPANGA RIVER CONTROL, SITIO KAINGIN, SUMACAB NORTE, CABANATUAN CITY, NUEVA ECIJA","Flood Control and Drainage","Completed",42849857.25,0,100,"Nueva Ecija 2nd DEO","Region III","CELSO C. FERRER  CONSTRUCTION CORP. (10643)","2019-07-04","2019-07-22",2019,"Regular Infra - GAA 2019 OO-2",15.4636,120.93564,"304903000","304900000"]
SHA-256
1e950e8b4b0a29c0b2471e05eb8b263947404c187a69c4481d3ee43fa34e5711

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.