Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CF0154

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CF0154","MODIFIED STANDARD DPWH-DEPED TWO (2) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING SAN ISIDRO CENTRAL SCHOOL, SAN ISIDRO, NUEVA ECIJA","Buildings and Facilities","Completed",14271763.81,0,100,"Nueva Ecija 2nd DEO","Region III","E.D. LIBUNAO CONSTRUCTION & TRADING (36525)","2019-09-26","2020-02-12",2019,"Outside Infra - GAA 2019 DepEd BEFF",15.30741,120.9056,"304925000","304900000"]
SHA-256
75f1dc9b123c7aedb61f4cd654bb461f18e82359f5203288c8e2ed055adfe1ee

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.