Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CH0012

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CH0012","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/MAINTENANCE OF SLOPE PROTECTION AT MANIBAUG PASIG, PORAC, PAMPANGA","Flood Control and Drainage","Completed",34276982.14,0,100,"Pampanga 2nd DEO","Region III","R.D. SADSAD CONSTRUCTION & TRADING (19240)","2019-07-11","2020-02-05",2019,"Regular Infra - GAA 2019 OO-2",15.10568,120.54754,"305415000","305400000"]
SHA-256
d23ce17b2d19d91f790963c29809a62a8a9860302684cc27299e3ebbcefec312

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.