Project 19CH0137

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CH0137","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRAUCTURES ALONG PASAK RIVER (PHASE 1), GUAGUA, PAMPANGA","Flood Control and Drainage","Completed",29395920.08,0,100,"Pampanga 2nd DEO","Region III","CEDAR CONSTRUCTION (24865)","2019-09-12","2020-06-07",2019,"Regular Infra - GAA 2019 OO-2",14.95139,120.62756,"305407000","305400000"]