Project 19CJ0028
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CJ0028","FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TARLAC RIVER CONTROL LEFT DIKE, TIBAGAN - TIBAG SECTION, TARLAC CITY, TARLAC","Flood Control and Drainage","Completed",41910765.7,0,100,"Tarlac DEO","Region III","R.R. RICAFORT CONSTRUCTION AND SUPPLIES (14402)","2019-06-07","2019-11-29",2019,"Regular Infra - GAA 2019 OO-2",15.47808,120.56446,"306916000","306900000"]
SHA-256
46e2f0f58b270ec3e4d705efd7be552db58a2cceb3400f5bc0d6acbcbde7ff82Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.