Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CJ0037

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CJ0037","FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL, SANTIAGO-SAN BARTOLOME SECTION, GERONA, TARLAC","Flood Control and Drainage","Completed",32071752.77,0,100,"Tarlac DEO","Region III","R.R. RICAFORT CONSTRUCTION AND SUPPLIES (14402)","2019-06-07","2019-11-17",2019,"Regular Infra - GAA 2019 OO-2",15.58407,120.55095,"306906000","306900000"]
SHA-256
c8656efce533cef4217c5dc59392a69f3729070c7d6b5597a987ebc9bae24f3b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.