Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CJ0047

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CJ0047","FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CAMILING RIVER CONTROL, PUROK 6, PINDANGAN 2ND, CAMILING, TARLAC","Flood Control and Drainage","Completed",27930164.15,0,100,"Tarlac DEO","Region III","RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) (40660)","2019-07-05","2019-12-11",2019,"Regular Infra - GAA 2019 OO-2",15.74257,120.41291,"306903000","306900000"]
SHA-256
cce203038e85baf583cadb00df442a62c763508ad81785136a67b49a555ec058

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.