Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CJ0111

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CJ0111","LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION/CONCRETING OF FLOOD CONTROL STRUCTURES (BOX CULVERT) AT SITIO SAN PEDRO, BRGY. IBA, SAN JOSE, TARLAC","Flood Control and Drainage","Completed",1411263.85,0,100,"Tarlac DEO","Region III","TARLAC 3-G CONSTRUCTION & DEVELOPMENT CORPORATION (36377)","2019-07-05","2019-08-18",2019,"Regular Infra - GAA 2019 LP",15.43675,120.41617,"306918000","306900000"]
SHA-256
73c54dc34e365b6e34c3f45f06cd8297fc7e2219b287e2d5ef138eda08c2cc83

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.