Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CJ0125

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CJ0125","FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CAMILING RIVER CONTROL, PUROK 3, BACABAC, CAMILING, TARLAC","Flood Control and Drainage","Completed",18620633.48,0,100,"Tarlac DEO","Region III","CALCON ENGINEERING (39961)","2019-07-05","2019-11-30",2019,"Regular Infra - GAA 2019 OO-2",15.72874,120.42989,"306903000","306900000"]
SHA-256
fafb082437c7665d16372ec46dd935c9004fb66daa49edc4c7eefecfd7114597

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.