Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CJ0126

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CJ0126","FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CAMILING RIVER CONTROL, PUROK 6, BACABAC, CAMILING, TARLAC","Flood Control and Drainage","Completed",18621234.63,0,100,"Tarlac DEO","Region III","CALCON ENGINEERING (39961)","2019-07-05","2019-11-29",2019,"Regular Infra - GAA 2019 OO-2",15.72836,120.42835,"306903000","306900000"]
SHA-256
2ebe2bb76c5685d4be2f7b9ed1ebb837a55abe91c9a2242c07b618058b15d2e5

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.