Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CJ0128

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CJ0128","FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TARLAC RIVER CONTROL RIGHT DIKE, RANG-AYAN-NANCAMARINAN SECTION, PANIQUI, TA","Flood Control and Drainage","Completed",23276468.11,0,100,"Tarlac DEO","Region III","CALCON ENGINEERING (39961)","2019-07-05","2019-12-05",2019,"Regular Infra - GAA 2019 OO-2",15.66889,120.53056,"306910000","306900000"]
SHA-256
f75f7dd6ff87a5d246fe6c04bdd7dc4b687a9655921d46089f16946bf19bdd39

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.