Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CL0007

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CL0007","CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL AT GABOR DIKE PHASE III, SAN FELIPE, ZAMBALES","Flood Control and Drainage","Completed",22757567.53,0,100,"Zambales 1st DEO","Region III","MCB ZAMORA CONSTRUCTION & SUPPLY (32006)","2019-06-21","2019-12-07",2019,"Regular Infra - GAA 2019 OO-2",15.05192,120.0949,"307110000","307100000"]
SHA-256
032bd76e7098e4550031d4c46468d23bd598594cc42b794c5bd64890c64ad9c1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.