Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CL0018

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CL0018","CONSTRUCTION OF SLOPE PROTECTION / FLOOD CONTROL STRUCTURE AT GABOR DIKE (PHASE II), DOWNSTREAM, SAN FELIPE, ZAMBALES","Flood Control and Drainage","Completed",32932567.96,0,100,"Zambales 1st DEO","Region III","CDC CONSTRUCTION & SUPPLIES (28275)","2019-06-14","2019-12-07",2019,"Regular Infra - GAA 2019 OO-2",15.04432,120.0688,"307110000","307100000"]
SHA-256
4ba3bb5e0adc94b5220d0fc9fe26e05054ea96a929dc3b02cb76cc91add2cbf1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.